The MRO ERP · by Hangarnautics
One record from intake to release
FLYTLYNE is the ERP for approved maintenance organisations. Planning, the hangar floor, stores, tooling, certifying staff and the records behind every release to service run on one data model, so nothing is re-keyed between the task card and the certificate, and nothing is lost.
- Hangar mode
- Office mode
- Offline on the floor
- Audit trail on every value
How it works
One shaft through every stage
The rotor on the logo is the model. Work enters at the fan, is prepared through the compressor, turns the shaft that every stage shares, gives up its work in the turbine and leaves as a record.
-
Fan · Intake
Work comes in
Enquiries, quotations and work orders arrive against a customer, an aircraft or an article, and the approval that will cover them.
-
Compressor · Prepare
The package is built
Task cards from the programme and the scope, parts reserved from stores, tools booked in calibration, people rostered with the right authorisations.
-
Shaft · One record
Everything turns on one record
Aircraft, article, task, part, tool, person and signature are one set of linked records, never copies. What the tablet writes is what the office reads.
-
Turbine · Execute and certify
Work is done and signed
On the floor in hangar mode: steps, measurements, scans and signatures. Gates hold until the prerequisites are met, then the release to service is issued.
-
Plug · Output
The record leaves whole
Maintenance records, airworthiness status, the certificate, and the work order's hours and parts, ready for invoicing and the reliability programme.
Modules
Built in modules, run as one
Nine modules on one record. Each carries the stage it serves.
- Intake
Work orders & quotations
Enquiries, quotes, customer approvals and the resulting work orders, each with its scope and the approval reference it is performed under.
- Prepare
Planning & maintenance programme
Due lists from the approved maintenance programme, forecasts by hours, cycles and calendar, and packaging into the ground time actually available.
- Prepare
Task cards
Steps, data references and revisions, measurements with limits, tooling and parts, independent-inspection points, and the sign-off each step needs.
- Prepare
Stores & logistics
Receiving inspection against the release document, quarantine, shelf life, batch and serial, and reservation to the package that needs the part.
- Prepare
Tooling & calibration
Tool register, calibration due dates and certificates, booking to packages, and a hard stop on out-of-calibration use.
- Prepare
People & authorisations
Licences, type ratings, authorisations with scope and expiry, recency, and training due, including human factors and fuel tank safety.
- Shaft
Airworthiness status
ADs, SBs, modifications, repairs and life-limited parts per aircraft and component, updated from signed work rather than re-keyed.
- Turbine
Release to service & signatures
Certifying staff sign with signatures bound to the content, the time and the authorisation. The CRS is issued only through the gates.
- Plug
Quality, audits & records
Findings and corrective actions, the internal audit schedule, records retention and export, and the audit trail behind every value.
On the floor
Two modes. One record.
Hangar mode is for gloves, glare and interruptions. Office mode is for density. A step signed in bay 2 is the same record in the office, at the same second.
Hangar mode · tabletvalues are examples
Step 7 of 9 · Bay 2 · G-DEMO
Fit fuel pump
Fit the replacement pump, P/N 452-0017-01. Torque follows in step 8.
Office mode · desktopthe same record
18 px body text, 48 px targets, 64 px actions and a 72 px sign button. Nothing depends on a steady hand or a quiet room.
16 px body, 56 px rows, dense tables and the same identifiers in the same monospace, with a slashed zero.
Steps, scans and signatures are kept on the tablet when the signal drops and synced when it returns. The unsynced count is always on the band.
Gates
Nothing releases until the gates are closed
The certificate of release to service is a consequence of the record, not a button. Six gates stand between a finished package and the CRS.
- Open
Authorisation covers the scope
The certifying staff member's authorisation includes the aircraft type, the task category and is within its validity and recency.
- Open
Maintenance data is current
Every task card references the data revision in force on the day the step was performed, and the revision is recorded with the step.
- Open
Parts have a release document
Every part fitted carries an acceptable release document on file, EASA Form 1 or FAA 8130-3, with batch and serial traced to the position.
- Open
Tools were in calibration
Every measuring tool booked to the package was within its calibration period when it was used, and is named on the step.
- Open
Independent inspection signed
Where the task requires it, a second authorised person has inspected and signed, and that person is not the one who did the work.
- Open
No open items
No open step, finding or defect remains, unless it is deferred under the organisation's approved procedure with the deferral recorded.
WO-2026-000456 · G-DEMO
- Package
- 100 h inspection
- Steps
- 9 / 9 signed
- Certifying staff
- LAE · B1.1 · auth. A-0417
The CRS states the work performed, the data used, the date and the authorisation, and is signed electronically.
Records
Every value shows where it came from
A number in FLYTLYNE is never alone. Open any value and the step, the person, the tool, the data and the time stand behind it.
- StepJC-2026-001234 · step 8 · Torque fuel pump bolts
- Signed25 OCT 2026 14:38:21 UTC · SIG-0A1B-25S9 · LAE B1.1
- ToolTW-0412 · calibrated 06 MAR 2026 · due 06 MAR 2027
- DataAMM 28-21-01 · revision 14 · in force
- PartP/N 452-0017-01 · S/N 0A1B-25S8 · Form 1 2026-01234
- DeviceTablet T-07 · bay 2 · synced 14:38:23 UTC
Readable without us
Records and their audit trail export in open formats the competent authority, the operator and the next system can read without FLYTLYNE in the room.
Kept as long as the rule says
Retention follows the regulation and the organisation's exposition. Nothing is deleted on a schedule the quality manager has not set.
Signatures that hold up
Each signature is unique to the signer, under their sole control, bound to what was signed and time-stamped, so it cannot be repudiated and cannot be moved.
Rollout
Implemented by Hangarnautics
FLYTLYNE is implemented by the people who build it. Five stages, each with an exit criterion the organisation signs, from reading the exposition to the first audit run on the live system. How Hangarnautics implements
- 01Discover
- 02Design
- 03Migrate
- 04Go live
- 05Sustain
Contact
Request a walkthrough
Tell us about the organisation and we will come back with FLYTLYNE running on your own kind of task card.
- 01Approvals held and their scope of work.
- 02Fleet, or the articles you maintain.
- 03The current system, and what it does badly.
- 04Who signs, and for what.