Request a walkthrough

The MRO ERP · by Hangarnautics

One record from intake to release

FLYTLYNE is the ERP for approved maintenance organisations. Planning, the hangar floor, stores, tooling, certifying staff and the records behind every release to service run on one data model, so nothing is re-keyed between the task card and the certificate, and nothing is lost.

  • Hangar mode
  • Office mode
  • Offline on the floor
  • Audit trail on every value

How it works

One shaft through every stage

The rotor on the logo is the model. Work enters at the fan, is prepared through the compressor, turns the shaft that every stage shares, gives up its work in the turbine and leaves as a record.

  1. Fan · Intake

    Work comes in

    Enquiries, quotations and work orders arrive against a customer, an aircraft or an article, and the approval that will cover them.

  2. Compressor · Prepare

    The package is built

    Task cards from the programme and the scope, parts reserved from stores, tools booked in calibration, people rostered with the right authorisations.

  3. Shaft · One record

    Everything turns on one record

    Aircraft, article, task, part, tool, person and signature are one set of linked records, never copies. What the tablet writes is what the office reads.

  4. Turbine · Execute and certify

    Work is done and signed

    On the floor in hangar mode: steps, measurements, scans and signatures. Gates hold until the prerequisites are met, then the release to service is issued.

  5. Plug · Output

    The record leaves whole

    Maintenance records, airworthiness status, the certificate, and the work order's hours and parts, ready for invoicing and the reliability programme.

Modules

Built in modules, run as one

Nine modules on one record. Each carries the stage it serves.

  • Intake

    Work orders & quotations

    Enquiries, quotes, customer approvals and the resulting work orders, each with its scope and the approval reference it is performed under.

  • Prepare

    Planning & maintenance programme

    Due lists from the approved maintenance programme, forecasts by hours, cycles and calendar, and packaging into the ground time actually available.

  • Prepare

    Task cards

    Steps, data references and revisions, measurements with limits, tooling and parts, independent-inspection points, and the sign-off each step needs.

  • Prepare

    Stores & logistics

    Receiving inspection against the release document, quarantine, shelf life, batch and serial, and reservation to the package that needs the part.

  • Prepare

    Tooling & calibration

    Tool register, calibration due dates and certificates, booking to packages, and a hard stop on out-of-calibration use.

  • Prepare

    People & authorisations

    Licences, type ratings, authorisations with scope and expiry, recency, and training due, including human factors and fuel tank safety.

  • Shaft

    Airworthiness status

    ADs, SBs, modifications, repairs and life-limited parts per aircraft and component, updated from signed work rather than re-keyed.

  • Turbine

    Release to service & signatures

    Certifying staff sign with signatures bound to the content, the time and the authorisation. The CRS is issued only through the gates.

  • Plug

    Quality, audits & records

    Findings and corrective actions, the internal audit schedule, records retention and export, and the audit trail behind every value.

On the floor

Two modes. One record.

Hangar mode is for gloves, glare and interruptions. Office mode is for density. A step signed in bay 2 is the same record in the office, at the same second.

Hangar mode · tabletvalues are examples

Task card JC-2026-0012341 unsynced

Step 7 of 9 · Bay 2 · G-DEMO

Fit fuel pump

Fit the replacement pump, P/N 452-0017-01. Torque follows in step 8.

Part serial · scan —
EASA Form 1 · 2026-01234 · batch B-7781
Signed 25 OCT 2026 14:32:08 UTC · SIG-0A1B-25S8

Office mode · desktopthe same record

Hangar mode

18 px body text, 48 px targets, 64 px actions and a 72 px sign button. Nothing depends on a steady hand or a quiet room.

Office mode

16 px body, 56 px rows, dense tables and the same identifiers in the same monospace, with a slashed zero.

Offline on the floor

Steps, scans and signatures are kept on the tablet when the signal drops and synced when it returns. The unsynced count is always on the band.

Gates

Nothing releases until the gates are closed

The certificate of release to service is a consequence of the record, not a button. Six gates stand between a finished package and the CRS.

  1. Authorisation covers the scope

    The certifying staff member's authorisation includes the aircraft type, the task category and is within its validity and recency.

    Open
  2. Maintenance data is current

    Every task card references the data revision in force on the day the step was performed, and the revision is recorded with the step.

    Open
  3. Parts have a release document

    Every part fitted carries an acceptable release document on file, EASA Form 1 or FAA 8130-3, with batch and serial traced to the position.

    Open
  4. Tools were in calibration

    Every measuring tool booked to the package was within its calibration period when it was used, and is named on the step.

    Open
  5. Independent inspection signed

    Where the task requires it, a second authorised person has inspected and signed, and that person is not the one who did the work.

    Open
  6. No open items

    No open step, finding or defect remains, unless it is deferred under the organisation's approved procedure with the deferral recorded.

    Open
Release to service

WO-2026-000456 · G-DEMO

Package
100 h inspection
Steps
9 / 9 signed
Certifying staff
LAE · B1.1 · auth. A-0417
0of 6 gates closed

The CRS states the work performed, the data used, the date and the authorisation, and is signed electronically.

Records

Every value shows where it came from

A number in FLYTLYNE is never alone. Open any value and the step, the person, the tool, the data and the time stand behind it.

Readable without us

Records and their audit trail export in open formats the competent authority, the operator and the next system can read without FLYTLYNE in the room.

Kept as long as the rule says

Retention follows the regulation and the organisation's exposition. Nothing is deleted on a schedule the quality manager has not set.

Signatures that hold up

Each signature is unique to the signer, under their sole control, bound to what was signed and time-stamped, so it cannot be repudiated and cannot be moved.

Rollout

Implemented by Hangarnautics

FLYTLYNE is implemented by the people who build it. Five stages, each with an exit criterion the organisation signs, from reading the exposition to the first audit run on the live system. How Hangarnautics implements

  1. 01Discover
  2. 02Design
  3. 03Migrate
  4. 04Go live
  5. 05Sustain

Contact

Request a walkthrough

Tell us about the organisation and we will come back with FLYTLYNE running on your own kind of task card.

  • 01Approvals held and their scope of work.
  • 02Fleet, or the articles you maintain.
  • 03The current system, and what it does badly.
  • 04Who signs, and for what.
ROI estimate What is paperwork costing your hangar? Put in your own figures and see the hours and value a digital record could give back each month. No prices, no sign-up. Estimate it

Sent to FLYTLYNE by email and not stored on this site. If sending fails, the page gives you the text to send yourself. Privacy notice