ROI estimate · From your own numbers
What is paperwork costing your hangar?
Paper task cards, re-keyed hours and chased signatures take technician time that could be on the aircraft. Put in your own figures and see what a digital record of the work could give back each month.
No prices, no sign-up to see the result.
How this is calculated
Simple arithmetic, in the open
- 01Technician hours freed
technicians × working days × (minutes lost per day × share recovered) ÷ 60 - 02Technician value
hours freed × share billed or redeployed × billed labour rate - 03Office hours freed
weekly quality and records hours × 4.33 × share recovered, valued at the internal cost of an office hour - 04Technician capacity
total hours freed ÷ (working days × 8)
The defaults are deliberately cautious: 60 minutes a day lost, a quarter of it recovered, half of that billed. Half an FTE means half a technician's month, without hiring.
Industry reports describe a larger problem. A 2026 BCG analysis cites roughly half of technician time going on non-wrench work, and an MRO software executive quoted in AVM Magazine put paperwork and compliance at about half of engineers' time. Maintenance labour rates have been rising at about 5.5–6% a year (Oliver Wyman, 2026), so every lost hour costs more each year.
What the estimate leaves out: fewer unbilled hours and parts, faster customer approvals, shorter audit preparation, and the cost of the system itself. A pilot on one bay measures minutes per task card before and after, so the estimate is replaced by your own figures.
Sources: BCG, Older aircraft, too few technicians: the aerospace fix (2026); AVM Magazine, The power of electronic task cards for MROs (2026); Oliver Wyman, Global Fleet and MRO Market Forecast 2026–2036, as reported by Insurance Business (July 2026). Figures are the publishers' own; FLYTLYNE makes no claim of customer results.
Get the estimate in writing
Take the numbers to your next meeting
We send the estimate with your inputs and the method, as a one-page summary you can forward to your accountable manager or quality manager.
- 01Your figures, the assumptions and the arithmetic.
- 02What a 90-day pilot on one bay would measure.
- 03No prices, and no follow-up unless you ask for a walkthrough.